2004

Durabuilt moves into its fifth and current location in Edmonton’s west end. Today, our head office has been expanded to include 180,000 sq ft of production space that features sophisticated robotics from around the world. The redesigned Hybridex 910 was launched, adding reinforcing capabilities and improved water evacuation to achieve superior performance results.

More News